Today we started framing walls on the West end of the building. They got all the outside 2x6 walls and started on the walls next to the show room and safe. If we all do a"no snow dance" maybe we can keep the ball rolling tomorrow.


Brian Tidwell decided to pour the last of the floors and the vault ceiling today. Even though He is in the HBA Home Show this weekend and has not finished his booth. The threat of bad weather tomorrow made it a smart choice. Thanks Brian!! Brad and I consolidated lumber and covered it in the event the weather men do get it right this time.

Today we snaped out the walls on the West end and put down the green plate. Kevin and Walter put the rebar in the vault ceiling. Brad and Russ worked on the North East retainer wall. All this with the help of the forklift from Wildcat Rental. Its a real time saver-Thank you Scott and Rick at Wildcat.




Cold and windy but the work goes on. Today we formed the ceiling in the gun vault and framed walls on the East end of the building. Brian Tidwell helped Brian Dancey frame while his men sawed control joints in the office and class room. Knight Heating came in to install the heat and return air boots in the vault ceiling.